The case: A machine previously...

Relocation of aluminium tube factory
Oct 31, 2016 by Isu Lassu
The project consisted of moving an aluminium...
Installation of a new machinery
Posted on Oct 31, 2016 by Isu Lassu

The project consisted of receiving the new machine, placing it in its final place, connecting electrically and assisting the original manufacturer in the installation and commissioning. We also had to modify the existing machinery and install a second hand crane structure above the machine.
16 days were enough from the arrival of the machinery, to the production startup of the line.