New blog posts

Tube & Wire 2018, Düsseldorf

Apr 16, 2018 by Isu Lassu

Refixing a machine by plating the floor
Refixing a machine by plating the floor

Jan 4, 2017 by Zalai-Ruzsics Botond

The case: A machine previously...

Relocation of aluminium tube factory
Relocation of aluminium tube factory

Oct 31, 2016 by Isu Lassu

The project consisted of moving an aluminium...

View all blog entries →

Case Studies

Refixing a machine by plating the floor

Refixing a machine by plating the floor

machine installation maintenance

Posted on Jan 4, 2017 by Zalai-Ruzsics Botond

The case: A machine previously installed by us has resulted to move and break the floor under itself. The analysis has shown that the flooring originally thought to be solid consists of two layers: an old flooring made of concrete plates laid on sand, and a new, modern concrete layer laid on top of the plates. During the fixing of the machine the anchors were drilled in 500mm long, thus fixing the machine to the lower concrete plates. With the vibration and extreme...
Relocation of aluminium tube factory

Relocation of aluminium tube factory

No tags added.

Posted on Oct 31, 2016 by Isu Lassu

The project consisted of moving an aluminium tube factory from Hungary to Poland with technology transfer and training.   The factory was disassembled, packed in wooden crates in Hungary, transferred to Poland and reassembled in the future place.    Auxiliaries that couldn't be transfered (cooling water, air supply) were purchased and installed along the relocation of the machinery.  ...
Extrusion part development

Extrusion part development

No tags added.

Posted on Oct 31, 2016 by Isu Lassu

In a 3-years-long development process together with our long time partner  Budai Benefit  we have succesfully developed an extrusion wheel that produces 200% more than the original manufacturer's parts, bringing a total benefit of 36% drop in production and maintenance costs per ton.    The whole process consisted of redesigning the piece experimenting with different materials  experimenting with treatment...
Creation of lubricant supply

Creation of lubricant supply

No tags added.

Posted on Oct 31, 2016 by Isu Lassu

With the relocated machinery's need of lubricant the factory's previous supply of lubricant wasn't enoughm therefore we have created a project to ensure lubricant storage, supply and filtering.   The project consisted of design of a storage tank, chosing the pumps, installation of electrical supply and some 200m long piping of supply and return. For filtering a second hand drum filter was chosen that was installed on top of the storage tank.